Choose your scope and options to see how many weeks design, ordering, demolition and installation usually take.

These tools give planning-level estimates from typical values and the details you enter. They are not quotes, designs or engineering, and results depend on your actual kitchen, the age and condition of the house, materials, availability and local rules. Only a home visit can confirm what a kitchen needs, and we give you an itemized written estimate before any work begins.

How it works

Four quick steps.

  1. 01

    Choose the scope

    Refresh, standard remodel, major remodel or addition.

  2. 02

    Set the options

    Custom cabinets, structural work, permits and design time.

  3. 03

    See the phases

    Design, ordering, demolition and rough-in, installation and finishing.

  4. 04

    Plan around it

    Use the totals to plan holidays, guests and your temporary kitchen.

Tips

  • Order cabinets early. They are usually the longest wait.
  • Late selections cause more delays than anything else.
  • Add a buffer for permits and hidden conditions.
Questions

About this tool.

Is this a schedule?

It is a planning estimate. We write a project schedule once the scope is set.

What slows a remodel most?

Late selections, back-ordered materials and hidden conditions.

Can the time be shortened?

Often, by deciding early and choosing in-stock items.